Contact us by e mail
or telephone
01259 750395
It took over 3 months for the clubhouse to be repaired after the flood damage of January 25th. See the devastation caused below and the work done to repair it. Floors had to be lifted and wall replaced. Thanks to Dave Richards for all the photos
back to top